— Technical characteristics for protection trip units Protection functions

ABB Code ANSI Code Function

Threshold

Threshold step

Tripping time

Time Step

Synchro- check SC

25

Synchrocheck (Live busbars)

Ulive = 0.5…1.1 Un ∆U = 0.02…0.12 Un ∆f = 0.1…1Hz ∆Φ = 5…50° elt

0.001 Un 0.001 Un

Stability voltage time for live state = 100...30000ms Minimummatching Time = 100...3000ms

0.001s 0.01 s

0.1Hz 5° elt

Tolerance

± 10%

Synchrocheck (Live,Dead busbars) Frequency check off Phase check off Dead bar configuration

Ulive = 0.5…1.1 Un Udead = 0.02…0.2 Un

0.001 Un 0.001 Un

tref = 0.1…30s

0.1s

Reverse/standard

Primary voltage

100...1150

100, 115, 120, 190, 208, 220, 230, 240, 277, 347, 380, 400, 415, 440, 480, 500, 550, 600, 660, 690, 910, 950, 1000, 1150

Secondary voltage

100...120

100, 110, 115, 120

Tolerance ± 10% (1) With Vaux all thresholds are available. Without Vaux minimum threshold is limited to: 0.3In (with In = 100A), 0.25In (with In = 400A) or 0.2In (for all other ratings) The tolerances above apply to trip units already powered by the main circuit with current flowing in at least two-phases or an auxiliary power supply. In all other cases the following tollerance values apply:

ABB Code

Trip threshold

Trip time

L S

Trip between 1.05 and 1.2 x I1 ± 20%

± 10% ± 15% ± 15% ± 15%

± 20%

≤ 60ms

I

G

± 20% ± 20%

Other protection

(2) 2I Trip time: • < 3ms when the fault current is above 18kA • 7ms (three-phase) or 9ms (single-phase) when the fault current is greater than three times the 2I setting (I31) • ≤ 15ms when the fault current is lower than three times the 2I setting (I31) (3) Instantaneous protection can be permanently non-defeatable through the dedicated extracode.

Key: -